Your turf system quality and performance is largely dependent on how the turf is installed, we have the exact technical know-how with our experienced technical and installation team, the one you can trust on !

Artificial Grass Installation

We are involved in all the activities related to construction of sub base of artificial turf filed, this includes the designing, construction, inspection, advising and development. Before initiating any project our experienced civil engineers and technical team carries out a site survey before starting the installation process.

We carry out the installation procedure that meets FIFA standards if required or the best possible installation procedure. Our installation procedure includes vertical and horizontal drainage to clear the surface water from the field which needs to be professionally constructed to meet the highest playing standards.

The result is the field which requires minimum maintenance and provides world class playing surface for professional and armature players.

Acrylic Installation

  • Preliminary Works
  • Asphalt deck should be compact, stable, free from oil, grease and humidity and perfectly level. Allow the deck to oxidize for period of 3-4 weeks.
  • Cement deck should be clean, free from oil, dust, humidity and stable and protected by a vapor barrier. The deck should be treated with a honing machine with diamond tool or shoot-peening machine in order to make the surface uniformly rough and remove all trace of dirt or dust.
  • Application of resin cycle
  • Use a rubber squeegee to apply 1-2 coating of softbase, an acrylic resin-based paste with selected sands is applied depending upon the porosity of the deck. Before application the product should be diluted with 30% clean water.
  • Once the product is cured, use a rubber squeegee to apply 3-4 coatings of product and an acrylic resin based paste with rubber granules . Before application, dilute the product with about 40% clean water and mix with the additive SE to prevent the rubber granules from lumping and creating flaws on the surface .
  • Once the product is cured use a rubber squeegee to apply 2-3 coatings above which the resin based coating is applied.
  • Two coats of line marking paint is applied to mark the court lines.

PU Installation

  • Preliminary Works
  • Asphalt deck should be compact, stable, free from oil, grease and humidity and perfectly level. Allow the deck to oxidize for period of 3-4 weeks.
  • Cement deck should be clean, free from oil, dust, humidity and stable and protected by a vapor barrier.
  • Application of resin cycle
  • Glue the prefabricated granular rubber mat on the cement or asphalt surface.
  • Use a smooth metal spatula to apply 2 coatings of two component Polyurethane filler.
  • After allowing the filler to dry, use a spatula calibrated to apply two self leveling two –component PU Coating.
  • When the product is dry use a roller to apply 2 coatings of two component Pavisint Finish 90.
  • Mark in coat lines by roller or brush with Pavisint Line, a ready to use two component PU paint.

Disclaimer: Above Videos are only for representational purpose the actual installation process may differ